Quote:
Originally Posted by Maxfield
Very elegant work Draconius. I'll be experimenting with some of the blanks and rail sections to do a homemade transition while we're all waiting for a precut transition pack. I'll post some pics if it works out.
I've been working on my own which are based on RCP's photos of taping the different tiles flat-to-flat. Notice the bridge. The tile at the bottom of the bridge is duct taped to the road course rail--those two pieces do not have the locks. The red corners still "barely" attach. I also cut the side locks of a few tiles and cut out the holes to fit the rails--the tiles going up the bridge and down the other side. I still need to do some more work on the other side though and will probably just have that piece end up flat--making two conversion pieces: One for each tile set up. When I took that photo, the other side dropped down onto the track which I could do with either the 50cm or the 30cm tile tracks.

http://mini-zracer.com/gallery/album..._Layout_2_0red
__________________
Gallery TNB
TNB is offline   Reply With Quote